Critical Infrastructures

Sudlows are the UK’s leading specialist in the design, build and maintenance of energy efficient and sustainable critical infrastructure environments.

Our award winning data centre team provide consultation and a comprehensive service from audit to commission.

  • On-site Installation, Commissioning and Maintenance.
  • Principal Contractor
  • Full Service Provider

Sudlows data centre experts invest considerable time into the research and evaluation of both new and emerging products and technologies. Our commitment is to provide only the best solutions which are energy efficient, resilient mission critical environments.

  • Internal and External Construction
  • Modular Room Construction
  • Raised Flooring Systems
  • Uninterruptible Power Supplies (UPS)
  • Racking Systems & Cold-Aisle Containment
  • High Density Cabinets
  • Fire Suppression
  • DCIM (Data Centre Infrastructure Management)
  • BIM (Building Information Modeling)
  • FAT (Factory Acceptance Testing)
  • Commissioning
  • IST (Integrated System Testing)
  • Witness Testing
  • Facilities Management

The combination of innovation, environmental awareness, technical excellence and global support make us the data centre provider of choice from consultation, to design and implementation.

We have the teams and the knowledge to consult, design & implement your data centre build. With your needs and our expertise in building well designed, green data centres, we will achieve any agreed goals put in place.

If you are developing a continuity plan, considering Gap Analysis to improve resilience, building a new data facility or upgrading an existing one, simply contact our award winning team of design engineers for advice.

Find out how we can maximise your data centre performance, minimise your energy consumption, ensure a measurable Return On Investment (ROI) and deliver a fully integrated solution.

Case Study

Client | AO World PLC

The Solution

The new data centre was fitted with 8 x data cabinets installed in a cold aisle arrangement in 2 rows of 4 configuration. The facility was created to deliver a data centre capable of handling a maximum IT load of 48kW. This design delivered on all three core aspects and is a model that AO look to replicate across a planned European roll out. The average IT load was configured on 6kW per rack for all 8 cabinets.

Electrical

  • The data centre was fitted with a 250A Low Voltage (LV) electrical switchboard panel, automatic transfer switch (ATS), complete sub-main distribution breakers, with UPS bypass fitted with Castell interlock system.
  • A new sub main cable from the existing LV switch room on the ground floor was installed along with a new 250A MCCB to supply the new data centre LV panel.
View full case study View all case studies

Build

Stockport Council Data Centre Build Project

Sudlows were appointed to design and build a new data centre facility for Stockport Council within a short time frame of just 7 weeks. Time-lapse cameras were installed on site to capture our Critical Infrastructures team working throughout the project.  The delivery of this facility has allowed Stockport MBC to start to migrate services from an existing, aging computer room, into a brand new, high efficiency, resilient data centre.

Sudlows are able to deliver innovative and creative technologies in order to provide reliable critical power solutions.

We source and install effective and resilient mission critical systems to provide instantaneous defence from power interruptions. 

  • UPS back-up systems
  • Standby Generators
  • Low/High Voltage (LV/HV) Switchgear

At Sudlows we believe an integrated, reliable and innovative back-up power system should be at the core of any mission critical environment. With over 100 years’ experience, we are able to work with you from installation, design and through to management.

  • Critical Power Energy Audit
  • Electrical Testing
  • Power Quality Analysis
  • Generators
  • Emergency Power Response
  • LV/HV Switchgear
  • Uninterruptible Power Supplies (UPS)
  • CHP (Combined Heat & Power)
  • Load Bank Testing
  • Flywheel Technology

As all projects and systems are unique, here at Sudlows we tailor and creatively design each critical power system to ensure the most resilient, cost effective and sustainable solution is delivered.

We have worked across an extensive range of projects delivering mission critical power to essential infrastructure for hospitals, broadcasters & transmission centres, banking and data centres.

With our expertise and proven record, we can guarantee resilient power continuity, ensuring uptime availability. By working with a dedicated team of electrical engineering specialists Sudlows can ensure the protection and safety of core power infrastructures.

Case Study

Client | AO World PLC

The Solution

The new data centre was fitted with 8 x data cabinets installed in a cold aisle arrangement in 2 rows of 4 configuration. The facility was created to deliver a data centre capable of handling a maximum IT load of 48kW. This design delivered on all three core aspects and is a model that AO look to replicate across a planned European roll out. The average IT load was configured on 6kW per rack for all 8 cabinets.

Electrical

  • The data centre was fitted with a 250A Low Voltage (LV) electrical switchboard panel, automatic transfer switch (ATS), complete sub-main distribution breakers, with UPS bypass fitted with Castell interlock system.
  • A new sub main cable from the existing LV switch room on the ground floor was installed along with a new 250A MCCB to supply the new data centre LV panel.
View full case study View all case studies

Audit

Design

Build

Maintain

Stockport Council Data Centre Build Project

Sudlows were appointed to design and build a new data centre facility for Stockport Council within a short time frame of just 7 weeks. Time-lapse cameras were installed on site to capture our Critical Infrastructures team working throughout the project.  The delivery of this facility has allowed Stockport MBC to start to migrate services from an existing, aging computer room, into a brand new, high efficiency, resilient data centre.

We provide leading edge cooling solutions developed by integrating and enhancing innovative cooling technologies.

We see ourselves as ambassadors in the endorsement of dynamic cooling systems.

  • Internal design capability
  • Bespoke site specific cooling solutions
  • Environmental focus on sustainable cooling

Sudlows provide reliable and resilient cooling solutions via a team of experienced mechanical engineers. We recognise the importance of maximising uptime in the critical space and can tailor a unique design to suit any critical environment.

  • Leading product manufacturers and brands
  • PUE calculations/predictions
  • ROI predictions
  • Design to Uptime Institute Tier classifications
  • CFD (Computational Fluid Dynamics), plotting and reports
  • Indirect Adiabatic Cooling (IAC)
  • High Density Cooling
  • Direct Fresh Air Free Cooling
  • Chilled Water Free Cooling
  • Chillerless Cooling
  • Chilled Water and PX pipework installations
  • CRAC and CRAH units, installation and commissioning
  • Clean Room cooling and ventilation technologies
  • Site monitoring systems
  • Ventilation and gas extraction systems

We work with Europe’s finest manufacturers to ensure we deliver the most sustainable and energy efficient cooling solutions.

With the client’s design criteria and business goals in mind, Sudlows will develop a bespoke solution incorporating efficiency and resilience while maintaining a sustainable redundant design, future proofing the client’s facility.

We deliver environmentally friendly, energy efficient cooling solutions that ensure a sustainable and minimal carbon impact whilst adhering to latest EU directives on environmental goals and carbon reduction.

Case Study

Client | AO World PLC

The Solution

The new data centre was fitted with 8 x data cabinets installed in a cold aisle arrangement in 2 rows of 4 configuration. The facility was created to deliver a data centre capable of handling a maximum IT load of 48kW. This design delivered on all three core aspects and is a model that AO look to replicate across a planned European roll out. The average IT load was configured on 6kW per rack for all 8 cabinets.

Electrical

  • The data centre was fitted with a 250A Low Voltage (LV) electrical switchboard panel, automatic transfer switch (ATS), complete sub-main distribution breakers, with UPS bypass fitted with Castell interlock system.
  • A new sub main cable from the existing LV switch room on the ground floor was installed along with a new 250A MCCB to supply the new data centre LV panel.
View full case study View all case studies

Audit

Design

Build

Maintain

Stockport Council Data Centre Build Project

Sudlows were appointed to design and build a new data centre facility for Stockport Council within a short time frame of just 7 weeks. Time-lapse cameras were installed on site to capture our Critical Infrastructures team working throughout the project.  The delivery of this facility has allowed Stockport MBC to start to migrate services from an existing, aging computer room, into a brand new, high efficiency, resilient data centre.